โครงการ - ผลงาน - เกียรติประวัติ : |
-Create the Calculation Table for calculating of Pressure Loss in air duct
(Simplified from the Manual of ACGIH)
-Re design and calculation of the existing dust collecting system at Siam Toyota, Chonburi,which is not properly perform, the former system is designed by Japanese engineer
-Design and control the installation the 18000 CFM dust collector for dry CNC machies at Siam Toyota
-Design and control the installation more than 20 units of Dust Collector at Diamond Tile PCL. factory, Saraburi
-Design and control the installation of many units of Wet Scrubber for Flue gas and Chemical Fume
-Design and control the installation of Activated Carbon Filtering Unit for solvent and paint vapor
-Design and control the installation of Industrial Paint Spray Booth which used dry filtering system
-Cooling Load Calculation and Re-correction Design of the existing failed air conditioning system at PRIME BOXLtd. samutprakarn
-Cooling Load Calculation, Ducting System Design and Machine selection of the air conditioing system for the expanded production area of SVI PCL, Patumthani
-Able to use all MS Office and AutoCad |