โครงการ - ผลงาน - เกียรติประวัติ : |
Company name : T.M.U.C.B (Asia) co., Ltd. (Owner)
Duration From : OCT 2000 - AUG 2004 (3.11 years)
Position : Chief Engineer/Factory Manager
Salary : 55,000 Bath Thai
Project a) : Viet-Thai Zinc Industry Joint Venture Company (Hanoi Vietnam
: 1 Factory, 1 Head Office, 1 Canteen, Staff House
Scope of work : The Design Routing Incoming feeder for underground of High Voltage 35 KVA. Standard Viet num.
: The Consultant and Management Control work.
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works.
: The Consultant and Construction Management Control works for Project
: The Supervision to Working Procedures or Project Objective
: Project Master Programmed and date for Completion.
: The Supervision defect clearance method, practical completion method head over method eye.
: Interim Payment Procedures.
: Variation Procedures, method of measurement.
: General Document Flow. General Document Flow.
Company name : Project Asia Co., Ltd. Project and Construction Management (Consultant)
: 52/33 Soi Nananua Sukhumvit 23 Bangkok 10110
Duration From : NOV 1993 - SEP 2000 (7 years)
Position : M&E Engineer/ Electrical Engineer
Salary : 39,000 Bath Thai
Project a) : The Four Sea son Hotel.
: 3-Storey and 4-Storey Building 10 Unit.
b) : Sheraton Grande Sukhumvit (5 Star Hotel)
: 49-Storey with one basement
c) : State Tower Project
: 63- Storey with 6 basement & 3 Storey Dome
Scope of work : Design Routing Incoming feeder for underground of High Voltage -Sub-Station 69KV.The Supply to 4 Loop 8Feeder 24 line
: The Consultant and Management Control work s for High Rise - Building and Factory all Project.
: The prepare document for Electrical Tender and Bill of Quantity.
: The Revise Shop Drawing for Electrical Engineering to work.
: The Supervision and Installed, Renovate for Fire alarm, PABX, MATV CCTV Communication work.
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works.
: The Consultant and Construction Management Control works for Project
: The Supervision to Working Procedures or Project Objective
: Project Master Programmed and date for Completion.
: The Supervision defect clearance method, practical completion method head over method eye.
: Interim Payment Procedures.
: Variation Procedures, method of measurement.
: General Document Flow. General Document Flow.
: The Revise Shop Drawing for Electrical Engineering to work.
: The Supervision and Installed, Renovate for Fire alarm, PABX, MATV CCTV Communication work.
: The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works.
: The Consultant and Construction Management Control works for Project
: The Supervision to Working Procedures or Project Objective
: Project Master Programmed and date for Completion.
: The Supervision defect clearance method, practical completion method head over method eye.
: Interim Payment Procedures.
: Variation Procedures, method of measurement.
Company name : Samsung Construction Co., Ltd. (Main Contractor)
Duration From : DEC 1991 - SEP1993 (2 years)
Position : Project Engineer (Electrical Engineering Division)
Salary : 22,000 Bath Thai
Scope of work : To estimated and evaluate for Electrical Tender and Bill of Quantity.
: Design and Supervision the Shop drawing for Electrical Engineering to work.
: Installed the Equipment Factory and wiring Control work.
Project a) : Samsung Electronics Co., Ltd.
: 4 Factory, 1 Canteen, 1 Head Office, 1 Guard house
: General Document Flow. General Document Flow.
Company name : Electricity Generating Authority of Thailand. Lampang
Duration From : OCT 1986 - SEP 1991 (5.1 years)
Position : Electrical Engineer
Salary : 13,070 Bath Thai
Scope of work : Supervision and Inspection Generating Supply Factory No.3
: Installation High Voltage Overheard Transmission Line.
Responsibility & Working Experience as Follows:
a) : The prepare document for Electrical Tender and Bill of Quantity.
b) : The Design Routing Incoming feeder for underground of High Voltage -Sub-Station 69 KV. To Supply 4 Loop 8 Feeder 24 line for Electrical.
c) : The Design and Supervision the High & Low Voltage from Transformers to SF6 High Voltage Switchgears and Ring Main Unit 3,200 Amp.
d) : Supervision the Installed Transformers Size 2,500 KVA.12 Set and -1,250KVA.2 Set, Main Circuit Breaker 6,300 Amp.12 Ea. And Bus way - 3,200 Amp.22 Feeder.
e) : The Revise Shop Drawing for Electrical Engineering to work.
f) : The Consultant and Management Control work for High Rise - Building and Factory all Project.
g) : Installed & Maintenance and Renovate the Equipment for High Rise Building, Pool Villas and Factory of Electrical System.
h) :The Skill Literacy Computer Program Microsoft Office, Excel, Auto -Cad 2007
i) : The Operation Commissioning Test-Run & Timing Preventive Maintenance for Equipment to Works.
j) :The Consultant and Construction Management Control works for Project
k) :The Supervision to Working Procedures or Project Objective
: Project Master Programmed and date for Completion.
: The Supervision defect clearance method, practical completion method head over method eye.
: Interim Payment Procedures.
: Variation Procedures, method of measurement.
: General Document Flow. General Document Flow.
l) : The monitor all construction project for cost Effectiveness as well as budget controlling and preparing BOQ
m) : The monitor store opening schedule and align all required resources to meet the targets while maintaining and meeting the quality standard.
n) : The management construction process and engineering activities comply with property lows and requlation
o) : Provide Property coordination of the site activities, Land Lord, customer and contractor.
p) : The complies with project Specification, procedures etc.
q) : The Handover for project to customers.
|